The most detailed decoration check-in classic

2022-07-22
  • Detail

1. Original ID card 2. Copy of ID card 3 on the same page as the household register with B5 paper

1. Original ID card

2. Copy of ID card 3 on the same page as the household register with B5 paper

3. Original household register/household card

4. Copy of household register/household card 3 on the same page as the ID card with B5 paper

5. Original house purchase down payment receipt

6 Copy of the down payment invoice for house purchase 3. If the area changes, it needs to be re copied

7. The original receipt of the property agency fee

8. The copy of the receipt of the property agency fee 3 is copied on B5 paper

9. The original purchase and loan contract

10. The copy of the purchase and loan contract 1A4 paper (ready or not)

11. The name seal is 11 cm square

12. The photos of the owner/and the permanent population 3

the bleeding of the treasure book

13.The House price difference (measured area - contract area) * unit price

14, comprehensive land price (total purchase price -4000* approved area) *10)%

15, total house price of deed tax *1.5%

16, total house price of stamp tax *0.03%

17, license fee of 5 yuan

18, production cost of 12 yuan

19, property right registration fee of 40 yuan

fees paid by property

20, property management fee, total house area *12 monthly *1.05 yuan/square meter monthly

21, unified service fee

22 Heating fee total area of the house *30 yuan/square meter annual

23, elevator operation service fee

24, water pump operation service fee

25, decoration management service fee

collection fee

26, domestic waste removal and transportation fee in December *2.5 yuan/month household

27, viewing fee in December *12 yuan/month household

28, TV network access fee of 300 yuan/household

29, total house price of maintenance fund *2%

30, utility charge 100 yuan/household

31 Advance water charge of 300 yuan/household

32, decoration deposit of 2000 yuan/household

house inspection classic

33, house inspection classic 1. Others would rather forget this

34, a wooden stick/small hammer

35, 3-4 personnel

36, tape measure 1

37, triangle ruler 1

38, electric pen 1

39, signing pen 1

40, mineral water >= N want to talk a lot with the property fee

41, change 2-5 yuan, prepare to copy the new house payment invoice and other acceptance documents (provided by the developer)

42, copy of filing documents - five certificates

43, residential quality assurance certificate

44, residential instruction manual

45, construction engineering quality identification certificate

46, real estate development and construction project completion comprehensive acceptance certificate

47 The completion acceptance filing form checks whether each sub item is filed

48. Issue the completion measurement form issued by the Beijing housing and Land Administration Bureau or the surveying and mapping team directly under the District Bureau. According to the relevant regulations, each item on the completion acceptance filing form must be reported to the competent department for filing

when you inspect the house, you can't just look at whether the developer has this filing form, but must carefully check whether each sub item is filed, Such as fire-fighting facilities. The completion acceptance filing form has a strict binding effect on real estate developers. As long as the project is submitted to the competent department for filing, the developer must be responsible for the real estate for life. If there is a problem, if it is the developer's fault, it can be investigated for responsibility

acceptance project

burglar proof door

49, whether the door frame is upright, whether the rolling ruler measures whether the sides are parallel

50, whether there are scratches/paint dripping traces on the paint stripping/falling surface

51 Whether there are holes in the bump

52, whether the closing is tight (especially the side with lock)/flexible/warped/whether there is a special sound

53, whether the door lock is complete/flexible/spring off

54, whether the hardware is rusted

door frame

55, whether the tape measure of the reserved door frame is parallel

wall

56, and tap gently with a small hammer (stick) for air cracks. Hearing the sound of "empty", there is a gap between each surface course and the wall (ground) surface, which needs to be reworked; There is no

57 when hearing the dull impact sound. Visually check whether there are cracks on the wall surface

58. Whether there is moisture condensation on the wall surface of the insulation layer. If there is moisture condensation on the wall surface, there is a problem with the insulation layer. This phenomenon is best detected in winter

59. Whether the wall body is inclined, you can use a triangular ruler to measure the accuracy and uniformity of the right angle of the corner

60. Whether there are cracks on the corner joint

61 Whether there are cracks in the connection between the corner and the ground

top floor residents

62, whether the ceiling is due to water marks

balcony

63, whether there are cracks in the two connections between the balcony and the house

64, whether there are cracks in the inner and outer walls of the balcony

65, whether there are water marks on the sealed balcony

windows

66 Whether the window frame is parallel/upright, measure it with a tape measure, and whether the height from both sides to the ground is consistent; Whether there is a gap between the window edge of the window frame interface and the concrete interface

67, tightness, close the window, listen to the sound insulation effect/visually check whether the closing is tight

68, whether the closing is flexible/smooth/in place

69, check whether there is water trace on the windowsill for water leakage

70, ask about the screen window, how to open the screen window without employment

71, visually check whether there are cracks inside and outside the windowsill

72, visually check whether the glass has scratches

73, and whether the appearance paint falls off, Whether there are scratches, bumps

74, whether the hardware is rusty

the upper and lower water pipes

75, seepage, leakage, blocking, open the faucet as far as possible

76, whether there is rust along the pipeline

radiator/pipe

77, the port of the water supply pipe connecting the water inlet pipe is higher than the port of connecting the radiator

78, the port of the return pipe connecting the radiator is higher than the port of connecting the water pipe

79 Whether the heating pipe is sleeved? If the heating pipe passes through the wall and the floor, it should be sleeved (at the junction of the pipe and the wall or floor, put a small section of pipe on the pipe). The casing on the ground should be 2-3 cm higher than the ground. If the ground is initially decorated, it should be 5 cm higher than the ground. Its function is to prevent the heating pipes from arching and cracking the walls and floors after thermal expansion and contraction

80, whether there is rust along the pipes

toilet

91, whether there is leakage to seal the floor drain, and water it for 24 hours to see whether there is water trace on the bottom layer

92, whether there is water storage first and then water drainage, whether there is water accumulation

93, whether there is water trace on the top layer, whether there is mildew

94 Socket the power socket in the toilet should be moisture-proof socket with splash proof measures

兰州不孕不育医院

厦门妇产医院

广州妇科医院

常州男科医院

Copyright © 2011 JIN SHI